Building redevelopment, energy efficiency and scheduled maintenance in a single project. Internal planning and teams, no subcontracting, no transfer of responsibility – and a single point of contact for the Administrator.
We don't just carry out jobs: we take responsibility for the entire intervention and its duration over time. A single point of contact, from the first analysis to maintenance.
A single interlocutor for the entire project, from design to delivery.
Dedicated technical office: we plan every intervention internally.
Operators coordinated directly by SSG, without subcontracting or rebounds.
Comprehensive management of technical and administrative procedures.
Support for the administrator even after the work is completed.
Support for financing in the name of the condominium, with Banca Sella.
These are the doubts that come to us most often from those who manage a condominium. This is how SSG responds, with a turnkey model and a single point of contact.
SSG assists the Administrator in every phase: preparation of the proposal for the Assembly, technical documentation, construction and authorization procedures. You coordinate, we manage.
Design with internal technical office and direct operational teams, without subcontracting. One contract and one person responsible, from start to delivery.
Thanks to the agreement with Banca Sella, the condominium requests financing as an independent entity. No condominium owner must resort to personal loans.
With the Scheduled Maintenance program (Option C) we protect the investment over time: annual inspections, touch-ups, renewal of the protective coating and extended warranty.
Technical simulation for a 96.8 kWp condominium system with 30.72 kWh of storage: the electricity expense goes from approximately €64,789 to €40,400 per year.
Indicative estimates based on location, orientation and historical consumption; they do not constitute a binding commitment on the actual performance of the system.
By way of example, here is how a quote for the condominium in the simulation could be structured: Options A and B are one-off interventions, while Option C is a multi-year service to be combined with A or B. The amounts are indicative and refer to this example case.
Importi inseriti a titolo di esempio. Ogni progetto viene quotato su misura dopo il sopralluogo.
“27 kWp condominium photovoltaic system built on the roof of a building in Noale, composed of 60 450 W modules.”
“2.7 kWp residential photovoltaic system built on the roof of a building in Cavallino-Treporti, with 6 modules and Huawei inverter.”
“20.64 kWp photovoltaic project on the roof of the Zircon condominium in Udine, with an estimated annual production of over 26,000 kWh.”
Plate data from system sheets and feasibility studies. Some values of the Cavallino-Treporti project are being updated.
From set-up to delivery, each process is coordinated directly by SSG with construction management and safety coordination included.
Site setup, chemical toilet, and safety fencing.
Rental and management of equipment for working at heights.
Professional washing and biocidal treatment of surfaces.
Application of a water-repellent and breathable protective coating.
Repair of deteriorated concrete structures.
Garages, railings, common areas, and painting of overhead garage doors.
Works management and CSP/CSE coordination included.
Enhancement of the roof with a PV system.
Survey, state of surfaces and consumption of common areas.
Technical and economical configuration, ready for assembly.
Assistance with financing decisions and procedures.
Internal teams, managed security, no subcontracting.
Delivery, guarantees and scheduled maintenance plan.
Deductions on common parts, bonuses and GSE incentives. We'll take care of the practices.
| Concession | Benefit | Value | Expiration | For whom |
|---|---|---|---|---|
| Renovation Bonus | IRPEF deduction on interventions on common areas. | 50% | 31/12/2027 | Condominiums |
| Ecobonus | For the energy efficiency of the common areas. | 65% | 31/12/2027 | Driving interventions |
| GSE – CER incentives | Incentive tariff on shared energy. | 20 years | Door open | Energy communities |
| Reduced VAT | Reduced rate on interventions and installation. | 10% | Always active | Common parts |
| Thermal Account 3.0 | For heat pumps and common integrated systems. | 65% | Until funds last | Common heating systems |
Indicative values and deadlines, subject to current regulations. During the inspection we verify the measures actually applicable to your condominium.
Thanks to the agreement with Banca Sella, the condominium can request financing without the individual condominium owners having to resort to personal loans.
SSG assists the Administrator in collecting the documentation, preparing the application and in relations with the credit institution until disbursement. The conditions (amounts, advance payment, duration and installment) are defined on a case-by-case basis during the preliminary investigation phase.
Documentazione — ti assistiamo noi
Only one contact person. Just one contract. A responsibility that continues even after the end of the construction site, with dedicated assistance to the Administrator and the Assembly.
No. For redevelopment interventions and for photovoltaics on the common areas, the majorities required by the Civil Code are sufficient. We prepare the documentation for the resolution.
Based on thousandths of ownership, as per the meeting resolution. The fee for any scheduled maintenance can also be divided into thousandths.
No. The construction site is planned to guarantee access and safety; we agree times and phases with the Administrator to reduce inconvenience.
No: Option A involves building redevelopment only. Photovoltaic (Option B) is recommended where coverage allows, to generate savings and autonomy.
Construction works have a standard 12-month guarantee, extendable for the entire duration of the contract with Option C. PV system: panels for 25 years, inverters and batteries for 15 years.
Yes. Generally speaking, an individual condominium owner can install a system intended for his own unit without requiring unanimity from the assembly. The project must respect the safety and decorum of the building, not jeopardize the common areas and leave the other condominiums the possibility of creating similar systems in the future. Before proceeding, we check the available spaces, define a balanced distribution of the coverage and manage the communication to the administrator and any necessary procedures.
Request a real estimate for your home or business with a free, no-obligation inspection: we are in Padua, come and visit us for a coffee!