Energy transforming into margin

We do not sell photovoltaic.
We sell margin.

For the owner of an SME the panel in itself matters little. What counts are the kWh you no longer buy, the income statement that improves, the investment that pays for itself. We speak that language.

SMEs and companies
You can see the difference in your bill.

How much you spend today. How much you would spend with SSG.

A company with average consumption spends around €48,000 per year on electricity. With an SSG system that cost item is drastically reduced, improving the margin on each product.

Without a system
€48.000

of electricity per year

Fixed operating costs that rise with every price hike. Total dependence on the energy market and margins eroded by utility bills.

With SSG system
−60%

in average energy cost savings

  • Energy self-produced during production
  • Accumulation for peaks and evening bands
  • Predictable costs, independent of price increases
Your questions, our answers

Four questions every entrepreneur asks themselves.

These are the questions we most frequently receive from SME leaders. Here is how SSG answers—with concrete data and no beating around the bush.

— 01

How much will I get back, and in how many years?

Feasibility study with real consumption data: calculation of savings projection, ROI and Transition 5.0 simulation. You have the numbers in hand before deciding.

— 02

Who manages the procedures? Do I have to follow them?

No. SSG manages everything: GSE, ENEA, Municipality, network manager and tenders. You don't have to think about anything, just enjoy the savings

— 03

What if the installer disappears after the collection?

€0 advance: you pay only after testing is completed. 25 year system warranty, after-sales assistance included. +30% annual growth — we're not going anywhere.

— 04

Where will I stop production?

Installation is typically completed in a few working days, scheduled around your shifts. We guarantee operational continuity even in the event of works.

Stories of energy that works

Real results. By the numbers.

New Cadoneghe nursery school — 39.16 kWp
Public housing · Cadoneghe (PD)

New Cadoneghe nursery school — 39.16 kWp

39,16 kWp
Installed capacity

“A public building that was born already efficient, with clean energy during lesson hours.”

New Cadoneghe nursery school — 39.16 kWp
Public housing · Cadoneghe (PD)
Conceria Beschin: a 59.80 kWp photovoltaic system
Tannery – Chiampo (VI)

Conceria Beschin: a 59.80 kWp photovoltaic system

59,80 kWp
Installed capacity
70,62 MWh
Estimated annual production

“59.80 kWp photovoltaic project for Conceria Beschin in Chiampo, composed of 130 modules and designed to produce approximately 70.62 MWh per year.”

Conceria Beschin: a 59.80 kWp photovoltaic system
Tannery – Chiampo (VI)
Maniero Luigi: 57.50 kWp for business operations
Windows, doors, and metalwork – Campagna Lupia (VE)

Maniero Luigi: 57.50 kWp for business operations

57,50 kWp
Installed capacity
70,65 MWh
Estimated annual production

“57.50 kWp photovoltaic project for Maniero Luigi, composed of 125 modules and designed to produce approximately 70.65 MWh of energy each year.”

Maniero Luigi: 57.50 kWp for business operations
Windows, doors, and metalwork – Campagna Lupia (VE)
From the ‘yes’ to energy

From first contact to connection: a clear path.

1

Technical inspection

Quickly.

2

Feasibility study

Immediately afterwards.

3

Practices and notices

We manage them.

4

Installation

In a few days.

Incentives work in your favor.

Deductions, calls for proposals, depreciation. Mapped out for you.

A table updated quarterly. For each measure, we tell you if your company is eligible.

Concession Benefit Value Expiration To whom it applies
Transition 5.0 Tax credit on investments in efficiency. 45% Until funds last SMEs and large businesses
Hyper-amortization 2026–2028 IRES/IRPEF tax increase. 180% 31/12/2028 All businesses
New Sabatini Green Concessional financing with interest contribution. Easy. Until funds last SME
Reduced VAT Reduced rate on the invoice. 10% Always active Specific interventions
GSE – CER incentives Twenty-year incentive rate. 20 years Door open Energy communities
Where energy yields the most

Where we generate the most margin.

Each sector has different consumption, times and load curves. The system must be sized accordingly.

Manufacturing

Warehouses and production facilities: constant daytime consumption.

Agricultural

Agrivoltaics, greenhouses, and dedicated regional calls for proposals.

Logistics

Large-scale roofing, electric fleet charging.

Food & beverage

Refrigeration and energy-intensive production cycles.

Offices and shops

Air conditioning and energy consumption during working hours.

Energy today, pay for it tomorrow.

The system is paid for with the savings it generates.

With instrumental leasing the monthly installments are often lower than the savings on the bill. The investment becomes positive cash flow.

100% deductible fees — as a business cost
No banking impact — on ordinary custody
Combinable — with tax credit
Real people, always the same ones.

Your direct points of contact.

For SMEs, you always have the same team: no hand-offs.

Real people, always the same ones.
The answers you seek

What you ask us most often.

Yes: the higher the cost of kWh you pay today, the faster the payback. The feasibility study always starts from your real consumption, not from sector averages.

Let's talk about your project

Find out how much you can save.

Request a real estimate for your home or business with a free, no-obligation inspection: we are in Padua, come and visit us for a coffee!